The inspections are all passed and the final tile set is going down. They are being applied with foam which gives superior adhesion and much less penetration of the membrane.
The stucco and the foam trim are almost done. The 3rd floor sheathing has been stuck in the city approval process for a while but should be ready for stucco work by weeks end.